• Text Size:
  • a
  • a

Call now: 01706 221279      Visit us:     

ainsworth maguire public relations manchester web text logo

b2b public relations since 1985

Home News Rooms PR Quote What is PR? About Us PR Services Online PR Brochures PR Tips PR Blog Contact Links Site Map

You are in: home > news rooms > hy-ten > Roll-out Steel Reinforcement Crucial

Search Ainsworth Maguire PR Manchester site Search Site...

Return to Index

Back | Next


AddThis Hy-ten Bamtec News Feed Button

Hy-ten Reinforcements Logo - concrete reinforcement

Hy-ten Ltd
Head Office
12 The Green
Richmond
Surrey
TW9 1PX
United Kingdom

T.+44 (0)20 8940 7578
F.+44 (0)20 8332 1757

admin@hy-ten.co.uk

www.hy-ten.co.uk
Hy-ten Reinforcements Logo - concrete reinforcement

Media info e-mail:
pr@ainsmag.co.uk

Roll-out Steel Reinforcement Crucial to Timely Academy Completion

Contractor, Wates Construction, has delivered both Barnfield South Academy and Barnfield West Academy to time. The two £30 million developments used Hy-Ten's innovative rollout concrete reinforcement system, Bamtec, to speed concrete floor construction.

Academies are challenging construction projects with high levels of mechanical services, high quality finishes and unusual design. This requires an extended fit-out phase that compresses the time available for the basic structure build. This time slot is often further eroded by winter weather causing delays.

To overcome these constraints, Wates Construction decided to adopt the Bamtec system for concrete floor reinforcement. Using pre-fabricated ‘carpets’ of roll-out steel reinforcement, rather than manually placed re-bar, saves substantially the time required for steel fixing and enables each floor to be set-up for concrete pouring.

Speaking for Wates, Phil Whitby, construction manager for both academies explained, “Using conventional methods each floor may take two weeks or more for steel placement before the pour. Bad weather adds to this greatly. Bamtec enabled us to reduce this to typically four days between each pour, taking maximum advantage of the available good weather windows. On one occasion we even completed a pour to pour cycle in less than two days.”

There are more advantages than just the speed and productivity of the Bamtec system. Hy-Ten provides substantial technical support that includes, where required, a service to apply finite element analysis to the structural engineering specification. By close curtailment of the stress zones around columns it is often possible to reduce the diameter, length or density of re-bar needed and achieve significant steel savings. Hy-Ten also offer a greater range of intermediate bar diameters so that the structural requirements can be met more precisely.

The Bamtec system eliminates the need for large teams of experienced reinforcement steel fixers. There are health and safety advantages too, as the roll-out carpets can be positioned with less back-breaking effort than with individually placed and tied re-bars. Bamtec fitters also report less back strain and injury.

“Completion of the structural frame and achieving a weather tight building enabled us to get on with the crucial fit-out phase just as the worst of the winter weather broke. The campus was complete and handed over on time, safeguarding and enhancing our reputation with the local authority,” concluded Phil Whitby.

The new Barnfield Academy buildings provide students and the community with a first rate environment and new learning opportunities. The academies have gone from strength to strength since being taken over by the Barnfield Federation in 2007.

In addition to moving into the vibrant new buildings, GCSE results on both sites have more than tripled and they are now judged ‘outstanding’ and ‘good’ by Ofsted. The Barnfield Federation is led by Barnfield College; an Ofsted rated ‘outstanding’ further education college that also has Beacon status.


More Information

Richard Webster, Director, Hy-Ten Ltd
Tel. +44 (0)151 525 1745 Fax. +44 (0)151 523 2252
E-mail: rkw@hy-ten.co.uk Web: www.hy-ten.co.uk
Hy-Ten Ltd, Bridle Road, Bootle, Merseyside, L30 4UG, UK

Release issued: April 18, 2011


Click image for full 300dpi view in a new window. Download Help


Barnfield Academies

The new Barnfield Academy buildings provide students and the community with a first rate environment and new learning opportunities.


Barnfield West Academy

The two £30 million Barnfield Academy developments used Hy-Ten’s innovative rollout concrete reinforcement system, Bamtec, to speed concrete floor construction.


Barnfield South Academy

Academies are challenging construction projects with high levels of mechanical services, high quality finishes and unusual design.



Text Version Downloads
Construction
Barnfield/Luton

Top of Page Return to Index | Back | Next  



© Ainsworth Maguire PR

T. +44 (0)1706 221279  or  T. +44 (0)161 408 5608  E: pr@ainsmag.co.uk

www.ainsmag.co.uk  www.free-pr-advice.co.uk  www.freepradvice.wordpress.com


Public Relations Manchester PR - Rawtenstall Public Relations Agency

Ainsworth Maguire

Home
Client News Rooms
Request a PR Quote
What is PR?
About the Partners
PR Services
About Online PR
PR Checklists & Advice
PR Blog
Company Brochures

Miscellaneous

Contact
Privacy Policy
Terms of Use
Our Copyright
Career at Ainsworth Maguire
Search Ainsworth Maguire
Resources & Links
Full Site Map

Client News Rooms

Crown Energy
Delavan Spray Technologies
Detectronic
Fueltek
Hawke International
Hyten / Bamtec
Rowe Hankins
Senior Hargreaves
Street Crane Company